Demo

Housing Industry

The construction site ends. Your responsibility does not.

After the handover, the long haul begins: warranty defects, insurance cases, maintenance — over years and hundreds of residential units. OX keeps every file complete: who, what, when, with which evidence.

Completed residential quarter with apartment buildings and a green courtyard AI-generated

What does Open Experience do for portfolio holders?

With Open Experience, portfolio holders continue the file that began on the construction site: acceptance and defect data comes along in structured form from the construction phase, limitation periods run automatically by trade and property, and reported defects are assigned and tracked until they are resolved. Every finding remains backed by photo and time stamp — even five years later.

From the handover report to the last day of the warranty

Takeover from construction

Acceptance and defect data comes along in structured form from the construction phase: no binders, no knowledge gap between construction and operations.

Warranty under control

Limitation periods by trade and property run along automatically; reported defects are documented, assigned and tracked until they are resolved.

Tenant reports, system tracks

Damage reports are recorded with photo and location and routed to the right service provider.

The insurance case

Condition before the damage? The time-stamped building documentation provides the proof.

Your tools for the building portfolio

Three building blocks carry the responsibility after the handover — over years and across entire portfolios.

Warranty is a module of its own

Reports come in through three channels: via app and browser, via a dedicated email address and via a QR interface for tenants and buyers. The limitation periods run along automatically — four years under VOB/B (German construction contract procedures), five under the German Civil Code (BGB).

What portfolio managers report

„We use the construction defect software on a project with 265 apartments for execution, acceptance and warranty defects. With conventional defect management, it would not have been possible to work through the defects in that time.“

— Senior site manager, Riedel Bau GmbH & Co. KG
  • Execution, acceptance and warranty defects in one continuous file
  • DIGISCHUTZ pixelates faces and license plates automatically — photos remain GDPR-compliant

Frequently asked questions

Does OX also work without the preceding construction phase?

Yes. You can start directly with your existing portfolio: create properties, record defects and inspections, bring in service providers.

How long does the data remain available?

Throughout the entire warranty period and beyond — it is your data, export at any time.

Can property management and service providers participate?

Yes, role-based: service providers receive access for defect processing and completion reports.

How do tenants or buyers report a defect?

Via an on-site QR interface or a dedicated email address per property; the report lands directly in the file of the residential unit.

What does it cost for an entire portfolio?

Our packages are openly listed (/en/preise/); for portfolios, the best way to discuss the right setup is in a demo.

Take over your portfolio with a complete file.