Demo

The site diary app for construction: your daily report is finished before you leave the site.

The site diary is mandatory in construction supervision (service phase 8 of the German HOAI, 'Leistungsphase 8') — and it eats your evenings. With Construction Diary you record daily reports in minutes on the go: weather, personnel, work performed, special occurrences. The finished report comes at the push of a button.

Abstract illustration: daily report cards in a row like calendar pages, the front one with an orange bookmark tab AI-generated

The whole construction day at a glance.

Construction Diary is the site diary app and software by Open Experience for keeping a digital site diary: daily reports are recorded on mobile on the construction site — companies present, headcount, work performed, obstructions, special occurrences. With Construction Weather, local readings from your own on-site weather station flow into the daily reports automatically, photos from Construction Photos are linked, and everyone involved is notified automatically. That way you fulfill the HOAI site diary duty (a basic service of the German fee structure for architects and engineers) without evening paperwork.

Recorded on site, not at the desk.

Dictate or tap in the daily report right on site — in minutes instead of after hours. Everything that must be documented (companies, personnel, work performed, occurrences) is walked through by the app in a structured way: nothing forgotten, nothing duplicated.

Daily report form in the app: sections for images, items from Construction Defects and a checklist, filled out directly on site

Dictate instead of typing: the AI assistant.

Simply speak the facts of the day into your smartphone — the AI assistant transfers them into your report template and writes a clear, professional text. AI texts are suggestions: you review and approve. No additional license costs — you store the API key of your preferred AI provider.

Site manager dictating his daily report into a smartphone on the construction site

Weather and facts come in automatically.

With Construction Weather, local readings (wind, precipitation, frost, bad-weather days) flow into the daily reports automatically — your own measured data instead of "according to a weather report from somewhere in the region": in disputes over obstructions and construction time, often the decisive detail.

App view "Weather stations" showing three construction sites with their current temperature, wind and precipitation readings

Reports that actually reach their recipients.

Finished daily reports as PDF, automatic notification of everyone involved, complete filing in the project. Contractors deliver their own daily reports too — via their free accounts.

„The free contractor accounts for defect completion notices and for creating daily reports are gladly used.“

— Thomas Kumm, b.i.g. bechtold ingenieurgesellschaft mbh

Works together with: Construction Weather (automatic weather data), Construction Photos (images in the report), Construction Defects (occurrence → defect), Construction Time (construction sequence).

Digital signature add-on

The site foreman and the site manager sign daily site reports with an advanced biometric signature, each step with a qualified timestamp. The module is available at an extra charge. More about the digital signature

Partners for this product

  • Cordulus — Weather stations and weather data
  • OptiTime — Resource planning and time recording

A partnership is not yet a finished interface — we clarify data flow and responsibilities per project.

The complete feature set

From the first mobile entry through approval workflows to the multi-day overall report. All features at a glance:

Mobile data capture
  • Report creation on mobile or at the office
  • Clearly arranged input fields
  • Automatic carry-over of the previous day's data
  • Summarizing daily reports
Configurable sections
  • Weather conditions and walkthroughs
  • Work performed, equipment use and deliveries
  • Notes, disruptions and obstructions
Photo documentation
  • Construction Photos directly integrated
  • Take already captured photos into the report
Work progress recording
  • Structured recording based on the bill of quantities
  • Automatic calculation of quantities and costs
  • Progress clearly presented
Partial and overall reports
  • Several partial reports per day
  • Multi-day overall reports with total costs
  • Individually customizable report structure
Approval workflows
  • Structured approval processes
  • Automatic notifications
  • Approval states at a glance
PDF reports
  • Automatic PDF generation
  • Customizable templates, professional formatting
Overview & search
  • Chronological display of all reports
  • Search and filter functions
  • Export for further processing
Free for contractors
  • Their own daily reports via free accounts
  • Automatic notifications
Client access
  • Clear overview of all projects
  • Notifications on changes
  • Export functions
Security & hosting
  • Made & hosted in Germany, servers located in Germany
  • GDPR-compliant processing, daily backups
Compatibility
  • Apps for iOS and Android, browser access
  • Offline functionality with automatic synchronization
  • Multi-user capable

The report that counts years later

  • Daily reports are created on the construction site instead of at the office in the evening.
  • Subcontractors write along too — via free contractor accounts.
  • Weather, personnel and work performed in one place: the record everyone relies on in a dispute.

Frequently asked questions

Is a digital site diary permissible?

Yes — what matters is content, continuity and traceability, not the medium.

What belongs in the site diary?

Customary entries are date, weather, companies present and headcount, work performed, deliveries, obstructions, instructions and special occurrences.

What does Construction Diary cost?

Construction Diary is part of our transparent packages — we publish all prices openly on our pricing page (/en/preise/).

Can several people work on the diary?

Yes, role-based — contractors create their own daily reports via their free accounts.

Usable on mobile and offline?

Yes — mobile apps for iOS and Android with offline functionality.

Is there a free site diary app?

For contractors, yes: subcontractors write their daily reports in Construction Diary through a free account that comes with the project invitation. For site management and site supervision there is the trial: four weeks on a real project at a fixed price, then Standard or Premium according to the price list.

Is it mandatory to keep a site diary?

For anyone taking on site supervision under the HOAI, yes: the site diary is a basic service of service phase 8 (Annex 10). For contractors, the duty follows from the construction contract or from the evidence rules of VOB/B, for instance for daywork and obstructions. Without a diary, the proof of weather, staff and sequence is missing in a dispute.

Can the AI write the daily report?

Yes — dictate the information, and the AI assistant transfers it into your report template and writes it up professionally. AI texts are suggestions and are reviewed and approved by you. It uses the AI provider whose API key you store yourself (e.g. OpenAI or Anthropic) — with no additional license costs from Open Experience.

The basics of the site diary

Our expert articles explain who has to keep the site diary, what goes into it and how an entry still holds up years later.

Call it a day without paperwork.