Demo
AI-generated

Pioneers of mobile construction documentation. Since 2009.

Take control of your construction phase.

The platform for the construction phase: defects, photos, site diary and 360° documentation — evidence-grade, mobile and from a single source. From the first site walk to the end of the warranty period.

  • From single-family homes to major projects with 100,000+ defects
  • Software + hardware from a single source

In use at companies that have to prove their quality:

  • PORR
  • Implenia
  • Leonhard Weiss
  • Wolff & Müller
  • B&O Bau
  • b.i.g.
  • Riedel Bau
  • Ingenieurgesellschaft Burgert
  • Brömer & Sohn
  • Adolf Lupp
  • Zech Bau
  • Markgraf
  • Gustav Epple
  • Julius Berger
  • BREMER
  • Siemens
  • HENSOLDT
  • Deutsche Wohnen
  • Covivio
  • Hines

You are liable for what happens on the construction site. We make sure you can prove it.

Notes, photos, Excel — scattered everywhere.

Defects on slips of paper, photos on three phones, lists in five versions. With OX, everything ends up in one place: the project.

Deadlines nobody tracks.

Rectification deadlines slip by unnoticed — until it gets expensive. OX monitors every deadline automatically and speaks up before things get critical.

Missing evidence in a dispute.

Years after acceptance, the one photo you need is missing. With complete, time-stamped documentation you win the argument before it ends up in court.

Your digital toolbox for the construction phase

Five tools, one project, no duplicate data entry — each module strong on its own, unbeatable together.

Software and hardware from a single source.

Five apps and our construction site hardware work hand in hand: everything recorded or captured on the construction site automatically ends up in the same project — located, dated, evidence-grade.

Software + hardware. From a single source.

Software can only document what someone records. That is why we build hardware too: the DIGIBAU 360 360° helmet camera captures every walkthrough in full and the Construction Webcam records progress around the clock. Construction Weather brings the readings from our partner's weather station into the site diary — and everything ends up in your project automatically.

Software and construction site hardware — at OX from a single source, matched down to the last detail.

Site manager wearing the DIGIBAU 360 helmet camera on site

New: OXI

The mobile platform that walks your site on its own.

OXI is our wheeled-leg robot: it carries the OX sensor kit — up to the DIGIBAU 360 360° camera — across the construction site. Stairs, ledges, tight building shells: OXI drives and climbs. That makes capture reproducible — the same walkthrough, the same angles, day after day. Developed in our own research on 3D surveying and AI object detection.

  • Obstacles up to 40 cm, slopes up to 30°
  • Only 20 kg — robust and compact
  • 10 kg payload — enough for the complete sensor kit
  • Up to 2 h runtime, quick-swap battery
  • Safe remote operation, ROS2-compatible

See OXI live at the Construction Robotics Showroom

Uncut video: OXI handles a staircase.

AI that works only with your project data. AI

Our image AI comes from our own research (BMBF project ESKIMO): it turns photos into ready-made defects, estimates work progress and pixelates people automatically — GDPR-compliant, servers located in Germany. No gimmick: less typing, faster reports, cleaner documentation.

Site manager photographing a crack in a concrete wall with a smartphone AI-generated

Image/text → defect

Take a photo or describe it briefly — the AI recognizes the construction defect and creates it in structured form, ready to assign.

Site manager dictating his daily report into a smartphone on the construction site AI-generated

Dictate daily site reports instead of typing

The AI assistant transfers your input into the familiar report template and writes a clear, professional text.

360-degree camera on a tripod in the shell of a major project AI-generated

Estimate work progress

From the latest site photo or a view from the 360° walkthrough, the AI estimates how far along a task in Construction Time is.

Construction worker on site, face automatically pixelated AI-generated

DIGISCHUTZ

People and faces pixelated automatically — plus detection of laser distance meters and construction objects.

More than software: service and process that carry you.

Digitalization rarely fails because of the technology — it fails on the process. That's why we deliver both.

Personal onboarding

We accompany your start in person — from the first project to a well-practiced process.

Support from Karlsruhe

Short paths, real people: our support team sits in Karlsruhe — no anonymous queue.

Construction process know-how

We digitalize your existing defect and acceptance process instead of forcing a foreign one on you.

Live every two weeks

Free webinars with real use cases — 45 minutes, no sales show.

What the people who use it every day say

For us, the current challenges of service phase 8 (LPh 8) are no longer conceivable without the services of Open Experience. Acceptance walkthroughs, report included, now take only a fraction of the time.

Project manager and site manager
igb — Ingenieurgesellschaft Burgert mbH

With its clear structure and simple handling, we reached our goals — digitalization, transparency, resources — in a very short time.

Manfred Lutz, Techn. Leitung B&O Gruppe
B&O Bau Baden-Württemberg GmbH

We handled the almost 8,000 defects in our project of more than 160 residential units quickly and efficiently. The quality of my work improved overnight.

Site manager
Implenia Hochbau GmbH

We helped establish mobile construction documentation.

From Karlsruhe since 2009 — founded as a spin-off of the KIT, with many years of expertise in construction and software.

  1. 2009 Founded in Karlsruhe as a KIT spin-off
  2. 2010 Entering the mobile world: recording defects on mobile with onlineBauabnahme
  3. 2014 QR codes link building components and documentation
  4. 2017 Locating defects directly in the BIM model
  5. 2018 Start of our own AI research projects
  6. 2022 DIGIBAU 360: the helmet camera system — a world first
  7. 2026 OXI: the new mobile platform for the construction site

Frequently asked questions

What does Open Experience do?

Open Experience is the platform for the construction phase: software for defect management, construction documentation, site diary, checklists and deadline tracking — plus its own construction site hardware such as the DIGIBAU 360 360° helmet camera. Everything from a single source, developed and hosted in Germany.

Who is the platform for?

For everyone responsible for construction execution: site managers and senior site managers at general contractors, project controllers, architects and specialist planners in site supervision (LPh 8), the housing industry and contractors — on projects of any size.

Which problems does the platform solve?

Scattered documentation, deadlines that slip by unnoticed and missing evidence in a dispute. OX bundles defects, photos, reports and deadlines in one project — time-stamped, traceable, evidence-grade.

Is the documentation legally sound?

The documentation is complete, time-stamped and traceable to the person — the basis that courts and experts expect.

Can several parties work at the same time?

Yes. All project parties work in parallel in the same project, and you assign permissions by role. Subcontractors get free accounts for defect processing.

Does it work on mobile and offline too?

Yes — apps for Apple and Android tablets and smartphones plus a browser version, with an offline mode for the relevant areas (even a basement with no signal is no obstacle).

Where is my data stored?

Servers located in Germany, GDPR-compliant processing, daily backups — made & hosted in Germany.

What does Open Experience cost?

Three transparent packages, publicly available at /en/preise/ — no hidden costs, no fees per drawing or model, no limits on images or items, free accounts for subcontractors included.

How quickly are we up and running?

A new project is set up in a few minutes, and we guide the rollout personally.

Is there a free trial?

We show you the platform in a personal demo on your own use case — faster and more honest than weeks of trying it out on your own.

In 45 minutes you will see how much better your construction documentation can run.

Talk to our experts — about your project, with your questions, no sales pressure.