generator

the product structure

Brief description

With this tool, a project structure can be generated automatically if the elements are the same on all levels.

example

level 1: | Apartments | Apartment 1, Apartment 2
Level 2: | Premises | Living, eating, sleeping, toilet/bath

The individual elements should be separated with commas.

Result

Apartments | Premises
-------------+-----------------
Apartment 1 |
            | Reside
            | meal
            | Sleep
            | WC/bath
Apartment 2 |
            | Reside
            | eat
            | Sleep
            | WC/bath
  

method

  1. Create layers
  2. Generate table
  3. Download
  4. Open in Excel
  5. Save as .XLS

Manual copying of the data The download does not work with large tables.

  1. Via the console
  2. TextTable variable

generator




More information?