Construction Drone: the perspective that is missing from the ground.

Large-scale construction sites, roofs, facades, inaccessible areas: the drone documents where nobody can reach — and the captures land where they belong: in your project.

Abstract illustration: drone scans a construction shell made of fine lines with a glowing orange measuring beam [KI-BILD] AI-generated

What is Construction Drone?

Construction Drone is the drone documentation and surveying service from Open Experience: construction progress, volumes and terrain models are captured by drone — 3D models, orthophotos and quantity takeoffs flow automatically into your construction project. Aerial photography and photogrammetry in one tool, filed alongside photos, 360° site walks and reports.

More than aerial photos: surveying.

Orthophotos, 3D terrain models and automatic quantity takeoff — earthwork volumes and areas come from the flight instead of from the measuring crew.

Progress at a glance.

The bird's-eye view shows what a hundred individual photos cannot: construction zones, logistics areas, crane positions — comparable across the entire construction period.

Document safely instead of climbing riskily.

Record roof and facade conditions without scaffolding or fall risk — for condition surveys and warranty questions.

Works together with: Construction Photos (image archive), DIGIBAU 360 (indoor documentation), Construction Diary (progress in the report) — aerial images complement the ground and indoor perspectives in the same project.

What nobody sees from the ground

  • The bird's-eye view documents roofs, excavation pits and areas that otherwise remain inaccessible.
  • Large areas captured in minutes instead of walked in hours.
  • Every flight lands located and dated in the same project.

Frequently asked questions

Who flies the drone?

The right operating model depends on the project and the construction site — get in touch and we will advise you on the approach for your undertaking.

What about permits?

Drone flights are subject to legal requirements that depend on the location and the project. We clarify the prerequisites together ahead of the deployment.

How much does Construction Drone cost?

Conditions on our pricing page (/en/preise/) or in a personal conversation.

Where is the data stored?

Servers located in Germany, GDPR-compliant processing — as with all OX services.

See your construction site from above.