Demo

Frequently asked questions

Frequently asked questions — clearly answered.

Twenty questions we are asked most often in demos and project meetings. Answered briefly, with a link to the page that explains it in detail.

Platform and products

What does Open Experience do?

Open Experience is the platform for the construction phase: software for defect management, construction documentation, site diary, checklists, and schedule tracking — plus our own construction site hardware such as the DIGIBAU 360 helmet camera with 360° capture. Developed and hosted in Germany, since 2009.

Who is the platform for?

For everyone responsible for construction execution: site managers at general contractors, project managers, architects, and specialist planners in site supervision (service phase 8 of the German HOAI, "Leistungsphase 8"), the housing industry, and contractors.

Can I use modules individually?

Yes — every product works on its own; the full benefit comes from using them together: one project, one data base, no duplicate entry.

What sets Open Experience apart from PlanRadar, Capmo, or Dalux?

Specialization in the construction phase instead of "a bit of everything" — and our own hardware ecosystem: no other vendor in the competitive field delivers software and its own construction site hardware from a single source. Honest comparisons can be found under "Knowledge".

What is DIGIBAU 360?

The 360° helmet camera system for construction documentation — a world first developed in-house: walk the site, select your position in the plan, trigger the capture; afterwards, navigate virtually through the construction site in space and time.

Working with the platform

Does it work on mobile and offline?

Yes — apps for Apple and Android tablets and smartphones plus a browser version (Chrome, Firefox, Safari, and others), with an offline mode for the relevant areas.

Can several parties work at the same time?

Yes — all project participants work in parallel in the same project, with role-based permissions.

What does subcontractor participation cost?

Nothing — contractor accounts for defect processing, completion reports (with proof photos), and daily reports are free of charge, via app or browser.

How quickly can we get started?

A project is set up in minutes; we accompany the rollout personally.

What AI is built into the platform?

AI from our own research (BMBF project ESKIMO): automatic defect detection via image recognition, pixelation of people (DIGISCHUTZ), recognition of construction objects, and AI progress checking — exclusively with your project data.

Pricing and getting started

What does Open Experience cost?

Three packages: Trial (one-time €395 for four weeks), Standard with Construction Defects and Construction Photos for €58 per user per month, and Premium with Construction Checklists, Construction Diary and Construction Time on top for €99 per user per month — list price for ten licenses and a twelve-month term, net plus VAT. There is also a one-time setup fee that scales with the number of users. Warranty is available for both packages as an add-on module with its own price. All terms up to ten licenses are publicly available on the pricing page, including a calculator.

Is there a free trial?

No — instead, there is the trial package for a one-time €395: four weeks on your real project, set up by us, with training; the amount is credited if you continue. If you just want to look, there is the personal 45-minute demo — free of charge and without sales pressure.

Are there limits on plans, photos, or items?

No — no fees per plan or model, no limits on images or items.

How does the demo work?

45 minutes, online, on your project, without sales pressure — bookable directly in the calendar.

Security and legal

Where is my data stored?

Servers located in Germany, GDPR-compliant processing, daily backups — developed and hosted in Germany.

Does the documentation hold up as evidence?

Complete, timestamped, and traceable — the foundation that courts and experts expect.

What happens to people in photos?

DIGISCHUTZ automatically detects and pixelates people and faces — directly in the system.

Who owns my project data?

You do — with export options beyond the end of the project.

Company

How long has Open Experience existed?

Since May 2009 — founded in Karlsruhe as a spin-off from the KIT/FZI research environment.

What was onlineBauabnahme?

Our original product (mobile from 2013) — today Construction Defects; some of the apps still carry the historical names in the store.

Didn't find your question?

Write to us — or clear it up directly in a demo on your own project. Both get you there faster than reading on.

Go to contact

The fastest answer comes in conversation.

45 minutes, your project, your questions — no sales pressure.