Every day, every room.
Recurring documentation rounds become complete instead of spot-checked: the 360° history of every room grows with every walk-through — comparable across the entire construction period.
Construction Dog accompanies you across the construction site and scans fully automatically in 360° as it goes — you do your rounds, and the documentation happens on the side. Every day, every room, without gaps.
Construction Dog is the mobile 360° scanning solution from Open Experience: the system walks along on your site rounds and captures 360° images fully automatically — without you having to stop or trigger anything manually. The scans land automatically in the project documentation: located, sorted by time, virtually walkable.
Recurring documentation rounds become complete instead of spot-checked: the 360° history of every room grows with every walk-through — comparable across the entire construction period.
While you inspect the construction site, Construction Dog scans — no photographing, no note-taking, no follow-up work. The most consistent form of "The construction site that documents itself".
The scans sit alongside DIGIBAU 360 site walks, photos and defects in the same project — located, sorted by time, virtually walkable.
Works together with: DIGIBAU 360 (helmet site walks from your perspective), Construction Photos (image archive), Construction Defects (findings from the walk-through).
DIGIBAU 360 sits on the helmet and documents your site walk from your perspective; Construction Dog scans along on its own, room by room. Together they cover planned as well as spontaneous documentation.
We would be happy to discuss the current status and the deployment options for your project in person — get in touch.
In a personal conversation — book a demo.
Servers located in Germany, GDPR-compliant processing — as with all OX services.