Demo

Construction Webcam: the site webcam sends every image to your project automatically.

The camera on the mast takes photos at fixed intervals and sends each one over the mobile network to your OX project. There the images sit in Construction Photos, easy to find by date, as proof of progress and as evidence.

Abstract illustration: construction site camera on a mast, its glowing orange field of view falls on a shell structure at night AI-generated

What is Construction Webcam?

Construction Webcam is the construction site camera from Open Experience. It takes high-resolution photos at an interval set on the camera itself and uploads them through its built-in SIM card, so it needs no Wi-Fi or LAN on site. Every 20 minutes the OX system imports the new images into Construction Photos. You can open them there on smartphone, tablet and computer, and the "Webcam" filter shows them separately from the other photos.

The progress nobody has to photograph.

Every day, in every weather: the image series shows construction progress without gaps, for client reports, evidence of disruptions and construction-time documentation. The date filter in Construction Photos takes you to the state of the site on a given day, and you can download a selection as a ZIP file.

Construction Webcam mounted on a container wall, the construction site with a crane visible in the background from an elevated perspective

Remote view instead of a drive.

The latest image answers the question "How is it looking?" without a trip to the site, from the office or on the go. New captures appear in the project about 20 minutes after upload.

Person in the office looking at a webcam image of the construction site on a laptop

Ready in three steps.

Mount the camera (with instructions or online guidance), connect it to a power source, and we assign it to your project. Mobile connectivity is built in; no on-site network is needed.

Works together with: Construction Photos (webcam images in the same archive as phone photos and 360° captures, with their own filter), DIGIBAU 360 (indoor documentation, while the webcam supplies the outside view).

Construction progress in pictures

  • The construction site documents itself, even when nobody is on site.
  • The image series proves construction sequences that nobody could otherwise reconstruct.
  • The captures land automatically in the same project as defects, photos and daily reports.

Origin and responsibilities

Brand
Open Experience
Manufacturer
not publicly stated
Hardware supplied by
Open Experience GmbH
Provided by Open Experience
Device, connection to your OX project, evaluation and support.

Frequently asked questions

Is there a live image or a time-lapse?

No. Construction Webcam delivers single images at the set interval and no video. The system does not create a time-lapse. You can download the images from any period as a ZIP file in Construction Photos.

What about data protection?

Construction Photos can automatically pixelate people on every image in a project, including the webcam images. The function is switched on per project. On top of that come clear signage on the site and GDPR-compliant storage in Germany.

How does the camera get onto the construction site?

In three steps: mount the camera (with instructions or online guidance), connect it to a power source, and we assign it to your project. Mobile connectivity is built in (SIM/4G); no on-site network is needed.

How much does Construction Webcam cost?

Conditions on our pricing page (/en/preise/) or in a personal conversation.

Who sees the webcam images?

Anyone allowed to see Construction Photos in the project also sees the webcam images.

The basics of the construction site webcam

Keep your construction site in view.