The construction site that documents itself
Cameras for construction site documentation
Software can only document what someone captures — so we build the helmet camera and the webcam ourselves and connect our partner's weather station directly. All three record your construction site automatically; the platform turns that into complete, time-stamped documentation.
What does "self-documenting construction site" mean?
A self-documenting construction site captures its condition continuously and automatically: the DIGIBAU 360 helmet camera records every site walk in full 360°, the Construction Webcam captures progress around the clock, and Construction Weather provides the weather data. All captures flow automatically into the Open Experience platform — located, timestamped, searchable. The site manager no longer documents; they supervise.
Three data sources, one project
Each device captures what it does best — assignment to the project happens automatically.
DIGIBAU 360
The helmet attachment captures 360° images on every site walk — complete image documentation over time, without stopping.
Go to the product pageConstruction Webcam
Photographs the site at fixed intervals and files every image in Construction Photos automatically.
Go to the product pageConstruction Weather
Weather data per construction site — automatically in the site diary, decisive for disruptions and claims.
Go to the product pageThe difference lies in the connection
Every capture lands automatically in the right project, at the right location, with the right timestamp — alongside your defects, reports, and checklists. With software-only vendors, you piece together camera, third-party subscription, and integration yourself; with us, it is one system.
- One responsibilityHardware, software, support — one contact partner, no interface debates.
- Automation instead of disciplineDocumentation happens even when nobody on site thinks about taking photos.
- Depth of evidenceA complete 360° history over time — walk virtually through the construction site as it was two years ago.
Software and our own construction site hardware — at Open Experience from a single source, matched down to the last detail.
And the next step is already underway
OXI is our wheeled-leg robot: it carries the OX sensor suite across the construction site — 40 cm obstacles, 30% inclines, two-hour quick-swap battery, safe remote operation. This makes capture reproducible, even where nobody goes every day.
- Sensors on boardOXI carries DIGIBAU 360 across the site and documents even the areas nobody visits every day.
- KRITIS3D research project"Thinking safety digitally": 3D surveying, robot-based capture, and AI object recognition outdoors.
Why this is more than a gadget
- DIGIBAU 360 — world premiere 2021, market launch 2022, born from the digiBau research project
- From single-family homes to major projects with 100,000+ defects
- Software + hardware from a single source — matched down to the last detail
- Every site walk complete instead of spot checks — the 360° walkthrough can be recalled for any point in time
Frequently asked questions
Do I need the hardware to use the software?
No — every software product works on its own. The hardware makes documentation automatic and complete; it is not a must.
Do I buy or rent the devices?
Both are possible; we clarify the terms in the demo meeting based on your project duration.
Does the hardware also work with other software?
The devices are built for the OX platform — that is where their added value comes from: automatic locating, timestamps, project assignment.
What happens to people in the captures?
DIGISCHUTZ automatically detects and pixelates people and faces — directly in the system, GDPR-compliant.
Who sets up the devices?
We accompany the rollout personally: commissioning, the first site walk, and training your team are all part of it.
See the self-documenting construction site live.
We show you a real 360° site walk — and what arrives in the platform afterwards.