Prices you don't have to request.
Three packages, one calculator, all terms up to ten licenses out in the open. Because "price on request" wastes everyone's time — and because you should know what we are talking about before the first conversation.
Prices as of November 6, 2026 · all amounts net, plus statutory VAT
Which package fits your project?
The Standard package digitizes defect management and construction documentation. The Premium package adds Construction Checklists, Construction Diary and Construction Time. Warranty can be added to either package as an add-on module. This way you choose exactly the feature set your project needs.
Do the math — before you talk to us.
Choose your role, move two sliders, and you see your price. Subcontractor access is free and does not count as a user.
More than ten licenses? The price per user keeps going down — quote on request.
cancellable monthly · 12–72 months
Trial
Work first, decide afterwards.
€395
one-time
Four weeks on a real project, set up by us.
- Full feature set of Standard
- Your own project, set up by Open Experience
- Web training for your team
- Credited if you continue
Standard
The core of the construction phase — defects and photo documentation.
€63
per user per month
€315 per month for 5 users
plus €900 one-time setup
- Construction Defects — record defects, track deadlines, defect notices, acceptance
- Construction Photos — geolocated, time-stamped, findable again
- Subcontractor access free of charge
- Apps for iOS and Android, offline mode
- Hosting in Germany, personal onboarding
Premium
The whole construction phase in one package: defects, photos, checklists, diary, schedule.
€107
per user per month
€535 per month for 5 users
plus €1,500 one-time setup
- Everything in Standard
- Construction Checklists — run inspections digitally, report at the push of a button
- Construction Diary — daily reports including weather data
- Construction Time — construction sequence by location and trade in a bar chart
You only need one more module?
Instead of jumping straight to Premium, combine Standard with exactly the module you are missing. The prices follow your slider settings.
- Standard + Construction Diary When daily reporting is also required.
€84 per user per month
- Standard + Warranty When the deadlines after acceptance are the real reason.
€83 per user per month
- Standard + Construction Checklists When recurring inspections are part of your routine.
€85 per user per month
Add-on module for Standard and Premium
Warranty can be added to any package. The surcharge applies per user and month and follows your slider settings.
- Warranty Track deadlines after acceptance seamlessly over the years; Construction Defects is required.
+ €21 per user per month
All prices net, plus statutory VAT. The published terms cover up to ten licenses. For larger volumes, framework agreements, joint ventures and billing by construction volume instead of by user, we will prepare a quote.
And what does it give back?
Construction documentation costs time above all — in the office at night, not on the construction site. Calculate with your numbers, not with ours.
The starting values are based on experience from OX rollouts and differ per role — move the sliders to your own numbers.
900 Working hours per year that go back into the project
€67,500 The value of that time per year
€7,920 Open Experience in the first year, including setup
After 6 weeks Open Experience has paid for itself — after that, €61,080 per year remains.
Calculation: users × hours per week × 45 working weeks × hourly rate. Costs: twelve monthly installments plus one-time setup. The result is a model calculation based on your assumptions — not a guarantee.
Hardware — usually rented, because construction sites end
Construction-site hardware is priced independently of the software license. The reference values give the order of magnitude; the exact terms depend on deployment time, quantity and connectivity.
| Hardware | Model | Reference price |
|---|---|---|
| DIGIBAU 360 | Rent or purchase | Rent from €210 per month · purchase on request |
| DIGIBAU 360 trial | Four weeks including setup and training | €395 one-time |
| Construction Webcam | Rent, minimum six months | from €125 per month · decreases with deployment time |
| Construction Weather | Rent, minimum six months | from €103 per month plus setup |
| OXI | Project-based deployment | on request |
Extended warranty, solar and cellular variants and bundles of software and hardware are calculated in the quote.
What always applies — our fair pricing model
We do not want to profit from you documenting your construction site completely. That is why we have no meters that punish exactly that.
- No fees per plan or modelUpload as many plans as your project needs.
- No limits on photos or recordsA construction site that documents itself must not have a photo limit.
- Free access for subcontractorsDefect processing, completion reports with proof photo and daily reports — no license needed, via app or browser, and without counting as a user.
- Volume discount without negotiationMore licenses and a longer term automatically lower the price per user — following the same scale shown in the calculator above.
- Hosting in GermanyGDPR-compliant processing, daily backups, development and support from Karlsruhe.
- Personal onboardingInstead of anonymous onboarding, we set up the first project together with you — that is the core of the one-time setup fee.
Frequently asked questions about our pricing logic
Do I pay per user or per project?
By default per user per month, combined with the chosen package. Subcontractor access does not count as a user — it is free. If you prefer to bill per project, that works too: project billing is based on construction volume and quoted individually.
Why does the price go down with the term and the number of users?
Because both reduce our effort. A monthly-cancellable contract costs about a quarter more than the twelve-month contract; a term of 72 months about 15% less. Likewise, the price per user goes down the more licenses you take — up to ten licenses you can see the scale in the calculator; above that, we will prepare a quote.
What is included in the one-time setup fee?
The setup of your environment by us: project structure, users and roles, templates for reports and defect notices, and the personal training of your team. It scales with the number of users — at five licenses it is 60% of the list value, at ten licenses the full amount.
What does subcontractor access cost?
Nothing. In all packages, subcontractor access is free — for defect processing, completion reports with proof photo and daily reports. It does not count as a license and does not change your price.
What is not included in the packages?
Construction-site hardware is priced separately. Also not included in the package prices are add-on options such as the Microsoft Teams interface, 3D and BIM features, custom letter templates and on-site training — we calculate these options in the quote.
Is Construction Time already available?
Yes. Construction Time is included in the Premium package at no extra charge; with Standard and the combinations, you can add it as a module.
Is there a free trial version?
No — instead there is the trial for a one-time €395: four weeks on your real project, set up by us, with training. That shows more than two weeks of clicking around on your own, and we credit the amount if you continue. If you just want to look, take the 45-minute demo — free and with no sales pressure.
What does the hardware cost?
The 360° helmet camera DIGIBAU 360 is available from €210 per month to rent or to buy, the Construction Webcam from €125 per month with a minimum deployment of six months, the Construction Weather station from €103 per month. Deployments of our OXI robot are priced per project. Reference values and details are in the hardware table on this page.
Are there limits on plans, photos or records?
No. No fees per plan or model, no limits on photos or records.
Are there terms for joint ventures, framework agreements or universities?
Yes — special terms apply to joint ventures, group-wide framework agreements and educational institutions. Talk to us.
How and when is billing done?
The setup fee is billed at the start of the contract, the licenses on an ongoing basis over the agreed contract term.
Companies that work with Open Experience
From housing associations to large-scale projects — the same pricing logic.
Now you know the price. The question left is whether it fits.
45 minutes, your project, your numbers — and an honest answer, even if it is "the smaller package is enough".