Demo
BIM World MUNICH 2026 banner: 10 Years, 24 to 25 November 2026, ICM – International Congress Center Messe München.

BIM World MUNICH 2026 · 10th edition

Meet us at Booth 21 at BIM World MUNICH

  • 24 and 25 November 2026
  • International Congress Center Messe München (ICM)
  • Booth 21 in the foyer, ground floor

BIM World MUNICH is the international platform for the digitalisation of construction, real estate and facility management: two days of congress on three stages, plus a trade fair with open forums. It is aimed at everyone who plans, builds and operates buildings, from clients and design offices to contractors and facility managers.

At BIM World MUNICH we show you what Open Experience makes possible for construction site management. Alongside our software and DIGIBAU 360, one highlight takes centre stage this year: OXI, our construction site robot. We will also be happy to tell you what we are currently working on in our research projects.

If you would like more than a quick look and want to talk to us in peace, you can book 20 minutes in advance, any time between 9:00 am and 5:20 pm. The time is then all yours: for questions, a personal demo or simply a good conversation.

This applies to customers who already use OX every day just as much as to anyone meeting us for the first time at the fair.

Book a meeting and get a free ticket

After you book, we will send you a free trade fair ticket by email.

On show at the booth

  • Construction Defects

    Record defects with photo, location and deadline and track them until they are signed off, including acceptance and warranty.

  • Construction Photos

    Site photos arrive in the project with time stamp and location. The DIGISCHUTZ AI blurs people automatically.

  • Construction Diary

    The daily report is written on site, with the companies present, headcount, work done and hindrances. Construction Weather adds the weather from your own site weather station.

  • Construction Checklists

    Work through inspection plans on a mobile device and back them up with photos. A failed check becomes a defect straight away.

  • Construction Time

    The construction schedule as a bar chart, location by location, with the progress of every task reported from site.

  • DIGIBAU 360

    You can try on the helmet attachment at the booth. Choose your position on the plan and trigger the shot in the Construction Photos app, even offline: the 360° image lands in the project with location and time.

  • Construction Webcam

    The site camera takes pictures at fixed intervals and uploads them via its built-in SIM card, with no Wi-Fi or cable needed on site. In Construction Photos you find them under the “Webcam” filter.

  • Construction Weather

    The weather station measures directly on site. Its readings help you prove weather-related hindrances and stoppages.

  • OXI

    Our construction site robot is running on both days of the fair. The video is just below.

  • SmartMark

    A four-legged robot projects drill holes, slots and fixing points from the BIM model onto the component by laser. We are developing it with GFTN, an affiliated institute of Darmstadt University of Applied Sciences.

  • KRITIS3D

    Together with Fraunhofer IPM and Angermeier Ingenieure we are building a process chain that captures the perimeter security of critical infrastructure in 3D and assesses it with AI.

OXI is live at the booth

OXI takes over the recurring tasks on the construction site. Stairs, steps, narrow shell construction: it drives and climbs, handling obstacles up to 40 cm. This makes data capture repeatable: the same route, the same angles, day after day. At the booth you can watch it in action and talk to the people who develop it.

Uncut video: OXI tackles a staircase.

Twenty minutes just for you

We set aside 20 minutes for your meeting, right at Booth 21 in the foyer. We show you whatever interests you, from defect tracking to the robot. Feel free to bring a current project or a specific question from your site management, and we will look for the answer together in the software. Each time slot is given out only once, so your slot stays yours, even when the booth is busy.

Book a meeting at the booth

No suitable time?

Whether you already use OX or are just getting to know us: simply tell us when you will be at the fair, and we will see you there.

For follow-up questions. At least 5 characters; digits, spaces and + ( ) - . / are allowed

We use your details solely to handle your enquiry. More in our privacy policy.