Working student · Karlsruhe and Baden-Baden
You develop devices that withstand dust, rain, and the construction site.
Helmet camera, weather station, sensors for our OXI robot: our hardware is built in-house. As a working student, you help shape the next modules.
What is this role about?
Open Experience builds the hardware for its own software itself: the DIGIBAU 360 360° helmet camera, construction webcams, weather stations, and the sensors for our mobile robots. As a working student in mechatronics development, you create detailed concepts for mechatronic modules and develop them further together with experienced engineers — using modern methods and tools all the way to 3D printing.
What to expect
The tasks that make up most of your week.
- Designing conceptsCreate detailed concepts for mechatronic modules.
- Developing in a teamThink concepts forward together with experienced engineers.
- ToolsApply modern development methods — all the way to 3D printing.
- PrototypesSupport the building and testing of prototypes.
What you bring
Not a checklist to tick off: if you confidently bring two of these four points, the conversation is worth having.
- Field of studyMechatronics, electrical engineering, mechanical engineering, or a related subject.
- A maker's mindsetEnjoy turning ideas into tangible prototypes instead of just drawing them.
- CAD and 3D printingFirst experience with these is a plus, not a requirement.
- LanguageGerman or English — either is enough.
What we offer you
- Working hours that fit around lectures and exams
- Our own workshop and production facility — your concepts get built, not filed away
- Close to research: robotics and AI projects run in-house
- Deutschlandticket, JobRad bike leasing, healthy snacks, shared game nights
How to apply
Short, honest, no application-folder theatrics.
- 1. Write to usA résumé and two sentences on why this role — to info@openexperience.de or via the contact page.
- 2. We get back to youWe reply promptly; for production roles in Baden-Baden within 24 hours.
- 3. Getting to know each otherA conversation by video or in person at our office in Karlsruhe. Afterwards you'll know who you'd be working with.
Not quite the right role?
All open positions are listed on our careers page — unsolicited applications are expressly welcome.
Frequently asked questions
Where do I work — Karlsruhe or Baden-Baden?
Both come up: development and research are based in Karlsruhe, production in Baden-Baden. We'll define the focus together.
How many hours per week?
Whatever fits your studies — we'll define the exact scope together.
Can I write my thesis with you?
Yes. The ongoing SmartMark and KRITIS3D projects regularly produce suitable topics.
Do I get access to 3D printing and the workshop?
Yes — both are available to you for prototypes.
Want to see first what you'll be developing for?
In 45 minutes we'll show you the platform and the devices on a real project.