Demo

Partner solution

OptiTime: plan resources, record working hours.

Who works on which site, when, and with which machine? OptiControl by OptiTime plans the deployment and records the hours. Open Experience documents what is actually built on site.

Updated: September 2026

What does OptiTime do?

With OptiControl, OptiTime develops software for the construction industry that works in three steps: plan, record, optimise. It combines staff, equipment and vehicle planning with time tracking and prepares the data for payroll, cost accounting and ERP systems. Open Experience works alongside it: defects, photos, checklists and daily reports capture how the building was actually built. Resources and working hours on one side, documented execution on the other.

What OptiControl covers

The provider structures the software into three steps that build on one another.

Plan

Assign staff, equipment and vehicles to projects — with bottleneck calculation and dependencies, in table or map view. Plus route and holiday planning.

Record

Staff hours for payroll and cost accounting, on site or at a fixed location, in real time or entered manually. Equipment and materials are booked along with them.

Optimise

Prepare payroll data automatically, hand it over to ERP and document management systems, and evaluate jobs, staff and equipment in real time.

What is kept where

The most common question in joint conversations is not what both systems can do, but where the line runs. This overview answers it.

TaskOptiControlOpen Experience
Deployment planning for staff, equipment and vehiclesCore task — with bottleneck calculation, routes and holidays—
Working hours for payroll and cost accountingCore task — on site or fixed location, real time or manual—
Handover to payroll, ERP and document management systemsCore task—
Locating defects on the plan, assigning them, tracking deadlines—Core task — Construction Defects
Capturing site conditions and construction details in pictures—Core task — Construction Photos
Daily report with weather, staff, equipment and events—Core task — Construction Diary
Inspection and handover forms on siteForm capture in the same app used for time trackingConstruction Checklists with inspection steps, measurements and photos

The last row is the only genuine overlap: both sides can have forms filled in on site. Which system owns that in a given project depends on where the result is needed — in the accounts or in the project records. We settle that in conversation rather than answering it in the abstract.

Why hours recorded twice are expensive

On many sites the same working hour is written down twice: once for the invoice, once for the project file. That costs time and produces two versions that later contradict each other. Deciding in advance which system owns which entry saves both — and makes it clear which record counts if there is a dispute.

A partnership does not automatically mean a ready-made interface for every constellation. We clarify data flows, setup and responsibilities against the systems you already have.

Explore Construction Diary

Meeting on the ground

Alongside its headquarters in Rheine-Mesum, OptiTime runs branches in Nordhorn and in Berkheim near Memmingen. At Bautag Süd 2025 in Berkheim, Open Experience appeared together with Teamsware — that is where we meet the same firms that want to bring planning, time tracking and construction documentation together.

See our events

Expert article: daily site report and time recording

The same working hour ends up in the daily report, in payroll and in the job costing. The article shows where the duplicate work comes from and how to untangle it.

Read the article

Provider and source

OptiTime goes back to "Elter Schaltanlagenbau", founded in 1992 by Frank Asche and Berthold Wedi, and today develops software for the construction industry with around 40 employees at three locations.

Discover more partners

Explore our partners for project workspaces, digital construction files, mobile devices and weather data.

All partners

Frequently asked questions

Who is OptiControl intended for?

For construction companies that plan staff, equipment and vehicles and record working hours for payroll and cost accounting — from mid-sized contractors to firms running their own fleet.

Is OptiControl the same as Construction Time?

No. OptiControl plans resources and records working hours for accounting. Construction Time from Open Experience plans the construction sequence by location and trade and records progress; it does not record working hours. The products have different jobs and do not replace one another.

Both systems handle forms on site — where do I draw the line?

A useful rule of thumb: whatever feeds the invoice belongs where the hours are recorded. Whatever evidences the state of the building and belongs in the project file belongs in the OX applications. What matters is where the result is needed later — we settle that together before rollout.

Does that mean recording hours twice?

That is exactly the situation the split is meant to avoid. Which system owns which entry is decided once; duplicate recording arises above all where that decision is missing.

Are an interface and a partner licence included in the OX package?

An OptiTime licence or a particular interface is not automatically part of an OX package. Talk to us about your use case; we will clarify the scope required and the terms.

Let's go through your workflow.

Show us how you plan and document today. In the demo we clarify where OX complements your existing tools — and where it should not.