Add-on module
Advanced biometric signature with a qualified timestamp
For daily site reports, acceptance records and defect notices from our construction services. Your company confirms who signs. A qualified timestamp proves when the document was signed and that it has not changed since.
Add-on module from Open Experience GmbH. As of: October 2026
What the digital signature covers
The Open Experience digital signature shows who signed a document, when they signed it and that the file has remained unchanged since. Your managing director or one of your administrators links the signer to a real person: the user profile holds the employee's email address and mobile number, and the system checks that both actually reach that employee. For every signature, the signer confirms with a second factor. After each signing step, a qualified trust service provider adds a timestamp under the eIDAS Regulation.
Legal framework: Germany (Civil Code BGB, construction contract rules VOB/B, fee schedule HOAI). Other countries have different rules, and contractual agreements take precedence over the standard periods named here.
Your company confirms the identity
Your managing director or an administrator in your company decides who may sign on your behalf. Open Experience does not inspect ID documents for this. We check that the contact details your company has assigned to a person really do reach that person.
- Assignment by the administratorThe administrator enters the employee's email address and mobile number in the user profile. In doing so, your company declares that these two channels belong to Ms Weber or Mr Yilmaz.
- Both channels verifiedThe email address is confirmed through the login, the mobile number through an SMS code. Only then can the person set up a signature profile.
- Five to seven signatures on a phoneDuring setup the person signs several times on the screen with a finger or stylus, in landscape mode and across the full width. Later the system places one of these signatures at the chosen spot in the document.
- Second factor for every signatureBefore signing, the system asks for an SMS code or a code from an authenticator app. An unattended laptop with an open session is therefore not enough to sign on a colleague's behalf.
Biometric data for each signature
When a signature is enrolled, the service stores how it was written: every point of the stroke with its timing and, where the device measures it, the pen pressure. None of this data is visible in the document. It is kept for a handwriting expert in case a signature is disputed later. The record of each signature notes which enrolled sample was used.
What the signed PDF contains
- The signature in the right placeAs on a paper form, the person places the signature where it belongs and can add name, company and date. The time of signing appears above the signature, with the verification code, checksum and link to the verification page below it.
- Embedded evidence recordFor each step the PDF carries an evidence file. It records who signed, how the person confirmed, on which device and which version of the document they saw.
- Qualified timestamp after each stepThe timestamp comes from SK ID Solutions, a qualified trust service provider on the EU trusted list. A qualified timestamp carries the legal presumption that its date and time are accurate and that the data has not changed since.
- Any recipient can verifyThe QR code in the document leads to the verification page. There the file can be uploaded and compared with the register. The calculation runs in the browser, so the file itself is never transmitted.
Signatures from clients and subcontractors
You invite external parties with their email address and mobile number. The person opens the link in the invitation and confirms with an SMS code sent to that number. The evidence record and the verification page then state explicitly that only the phone number and email address were verified, and that name and company were assigned by the person who sent the invitation.
Available in these construction services
Construction Diary
The site foreman and the site manager sign daily site reports one after the other. Each step receives its own timestamp.
View Construction DiaryConstruction Defects
Acceptance records and defect notices carry the signatures of everyone involved, including the contractor's.
View Construction DefectsConstruction Checklists
Inspection and handover records are signed as soon as the checklist is completed.
View Construction ChecklistsPrice on request
The digital signature is an add-on module to our construction services and comes at an extra charge, which depends on the number of signatures per month. Write to us and we will set up the module for your projects and send you a quote.
Frequently asked questions
Is this a qualified electronic signature (QES)?
No. A QES requires a qualified certificate on a certified signature creation device, usually a signature card or a remote signing service with identification by ID document. In Germany only a few trust service providers offer this. Where the law requires written form, only a QES can replace a handwritten signature (§ 126a BGB).
Which documents is the digital signature suitable for?
For documents with no statutory written-form requirement, such as daily site reports, inspection records and acceptance records. Courts may not reject electronic signatures solely because they are electronic (Art. 25 eIDAS), and they assess them freely as evidence. If your contract expressly prescribes a particular form, agree on this with your contracting partner beforehand.
What does the qualified timestamp prove?
It proves that the document existed in exactly this version at the stated time. For qualified timestamps the law presumes that date and time are accurate and that the data has not changed since (Art. 41(2) eIDAS).
Where are signatures and biometric data stored?
Documents, evidence records, enrolled signatures and their stroke data are stored on servers in Germany. The biometric data appears in no document and is used only to resolve a dispute over a signature.
How much does the digital signature cost?
It is an add-on module at an extra charge that depends on the number of signatures per month. Contact us through the contact form and we will get back to you with a quote.
Sources and legal basis
The legal statements in this article are based on the primary sources listed below. The article is not a substitute for legal advice in an individual case.
- Regulation (EU) No 910/2014 (eIDAS), Articles 25, 26 and 41 Legal effect of electronic signatures and qualified timestamps
- Section 126a of the German Civil Code (BGB), electronic form When only a qualified electronic signature can replace written form
- EU trusted list, entry for SK ID Solutions (Estonia) Qualified timestamping service "SK Time-Stamping Authority"
Request the digital signature for your projects
We will walk you through the process using one of your own documents and give you the price for your volume.